-->
&nbsb;

LUMCON NEWS RELEASES

Printable View

LUMCON Small Vessels gets a Lift (or Two)

LUMCON Small Vessels gets a Lift (or Two)

October 25, 2013


The new dock / boat lift area

Construction is underway for a new fuel dock and two new boat lifts for the Gadwall, Coastal Profiler and other smaller LUMCON vessels.  For those familiar with the DeFelice Marine Center grounds, the dock and boat lifts will be constructed in the area between the R/V Pelican dock and the trailer that was home to LUMCON in the years before the Marine Center was constructed.

LUMCON small vessel captain Carl Sevin is looking forward to the new construction.  “It’s going to make my job much easier.  We will have better access to the vessels for fueling and loading and unloading passengers and gear,” said Sevin. 


FooterGraphic